Black & White Property ServicesHave a property in mind?Start an enquiry

knowledge article

Commercial Property Handover Checklist

A property handover gives the receiving team the information and access needed to manage the premises from the agreed changeover point. It must explain the current position, including open work and missing records, rather than simply transfer a folder of documents.

Tell us what needs doing

The required package depends on whether the change concerns occupation, an FM appointment, a project or a particular service. Set the scope and responsible people first so the checklist addresses the real handover.

1. Identify the property and handover boundary

Confirm the site, areas, systems and services included. Record the handover date and which party holds each responsibility before and after it. Identify any retained landlord, tenant or supplier responsibilities.

If only part of a building is changing hands, show the shared interfaces clearly. Common access, plant and utilities should not disappear between separate area descriptions.

2. Record the current condition

Use the agreed inspection or condition records to describe the starting position. Identify defects, inaccessible areas and matters requiring further investigation. Keep photographs and supporting reports linked to the correct location.

An inventory states what is present; a condition record explains what is known about it. Neither should be treated as evidence of inspections that were not performed.

3. Transfer the operating information

  1. Asset and equipment lists, with understandable references.
  2. Relevant operating and maintenance information.
  3. Current schedules and recent service records.
  4. Applicable inspection reports and open findings.
  5. Supplier contacts and active service arrangements.
  6. Drawings or other property information included in the handover scope.

Check usability as well as presence. Files need to open, references need to make sense and the receiving team needs the access required to use them.

4. Explain outstanding work

List open jobs, orders, quotations, appointments and decisions. Give each an owner, next action and relevant date. Distinguish a completed task awaiting paperwork from work that has not been carried out.

Keep responsibility for unresolved actions explicit. Transferring a list without agreeing who follows it up can create a gap precisely when the service is changing.

5. Manage physical and digital access

Record the keys, passes and system access transferred through the approved process. Agree how outgoing access is removed and how sensitive information is handled. Keep credentials outside ordinary handover documents.

The receiving team should also know the appropriate contact and escalation routes for the property from the changeover date.

6. Confirm acceptance and follow-up

Record what has been received, what remains missing and when it will be supplied. Agree the first review point so unresolved items are checked rather than lost after the handover meeting.

Common questions

Does a folder transfer prove that handover is complete?

No. The information must match the agreed scope and be usable by the receiving party. Open gaps need owners and follow-up dates.

Should outstanding defects be excluded until repaired?

No. Their current status needs to be visible, with responsibility for investigation or repair clear.

Is a property handover the same as a technical survey?

No. A handover can include survey information, but the inspection scope and findings depend on the actual survey appointment.

Related services

Explore Project Handover, Testing and Commissioning, Asset Maintenance, all projects, services, sectors and locations, or discuss a property handover.

Next

Ready when you are

Tell us about the property.

Start with the repair, maintenance need or improvement you have in mind.

Start a property enquiry