Our approach
The existing boiler, cylinder and associated components were removed before the new installation was set out against the retained building services. Black & White Property Services installed an Ideal EnviroMax 2 60kW commercial boiler, an Ideal pre-plumbed commercial cylinder and a commercial MagnaClean filtration unit. New and modified pipework connected the equipment to the existing system.
The supporting work included a purpose-made plywood backboard, a commercial-grade equipment platform, colour coding of existing gas pipework and protective finishing around rough edges. Removed equipment and waste were taken away through the recorded waste route.
Work completed
- Removed the former boiler, cylinder, associated pipework and components.
- Installed the 60kW commercial boiler, commercial cylinder and filtration unit.
- Adapted pipework and connections to suit the retained building services.
- Built the equipment support and completed protective finishing.
- Commissioned and functionally tested the installation.
- Gave the site representative an operational overview.
Verified outcome
The completion report records the heating and hot-water system as operational following commissioning and functional testing. It also records the site handover. No performance saving or long-term efficiency improvement is claimed because the available evidence does not quantify one.
Project relationships
- Responsible business: Black & White Property Services.
- Sector: veterinary and clinical environments.
- Project type: plant replacement and building-services upgrade.
- Location: Gateshead area.
- Relevant services: commercial heating, hot-water systems, pipework alterations and commissioning.
- Display: both Black & White websites, with Black & White Property Services attributed as the delivering business.