State the boundary between the contracted equipment and adjacent systems. An air-handling unit, its controls and the heating or cooling plant serving its coils need coordinated attention, but they are not automatically included under one equipment label.
Define what each visit delivers
Specify the maintenance activity and completion evidence for each asset or task. A visit frequency alone does not establish whether filters, drainage, fans, controls or other components are being checked or maintained.
Use manufacturer information, operating conditions, relevant requirements and service history to establish timing. HSE's maintenance guidance explains the need for competent, planned work. Record the basis of the programme and review it after significant changes or recurring problems.
Keep specialist checks identifiable
Routine servicing, refrigerant leak checks, energy inspections and specialist extraction examinations have different purposes. State which activities are included and which need a separate instruction. Grouping suitable work into one attendance does not remove the need for the appropriate scope, competence and records for each task.
For equipment containing F gas, identify the relevant refrigerant information and responsibilities. The contract needs to reflect the actual equipment requirements rather than applying the same generic inspection entry to every unit.
Agree access and response arrangements
Identify plant locations, working hours, escorts, shutdowns and areas that must remain available. A ceiling unit above an occupied work area presents different access needs from equipment in an accessible plant room.
State how faults are reported and prioritised, what an attendance includes and who approves additional work. Separate a response target from the time required to finish a repair. Parts, diagnosis and access can affect completion after the initial attendance.
Make costs and exclusions clear
Check whether consumables, replacement parts, reactive visits, cleaning and specialist inspections are included. Define the process for findings that lead to extra work. A fixed maintenance fee does not explain the price of a later replacement unless the agreement explicitly covers it.
At review, compare scheduled tasks completed, recurring faults, unresolved findings and additional spend. Use the results to decide whether the programme still fits the equipment and the building's use.
FAQs
Does an HVAC contract cover refrigeration too?
Include refrigeration equipment explicitly where required. Confirm its tasks, operating needs and responsibilities rather than assuming it is included in the HVAC label.
Are all repairs included in the annual fee?
The written scope determines what is included. Check parts, labour allowances, call-outs and additional approvals when comparing proposals.
What should we send for a quotation?
Provide the asset list, previous service reports, known defects, operating hours and access requirements. Identify gaps so any initial survey is defined clearly.
Related help
Explore HVAC Maintenance and Servicing and Maintenance Contracts. Read PPM contract pricing and F-gas compliance, or discuss your maintenance scope.
Browse all services, maintenance, projects, sectors, locations and the knowledge centre.