What Should a Commercial Refurbishment Scope Include?

Explain who will use each area, what they will do there and when it will be occupied. A room name alone does not define its power, lighting, ventilation, storage or cleaning needs. Record required equipment and activities before fixing the layout.

Tell us what needs doing

Identify the main objective: better use of space, renewal of worn elements, a new tenant arrangement or a change to building services. This helps the team compare options when the budget requires a choice.

Describe retained, altered and new elements

Use drawings, photographs and a room or element schedule to identify what stays, what is removed and what is installed. Cover partitions, ceilings, floors, doors, finishes and fixed equipment as relevant.

Retained items need their condition and compatibility considered. Keeping an existing ceiling, for example, affects service access and how new work can be installed. Removal also needs its end condition defined: cleared space, capped connections, patch repair or a fully finished surface.

Include connected services

Identify power, lighting, heating, ventilation, plumbing, controls and relevant fire or security interfaces. Show who designs, installs and tests each connection. This prevents a quotation for visible finishes leaving the services needed to use the space unresolved.

Include the surveys and approvals required before construction. HSE describes construction project roles, while government guidance explains building-regulation duties. The project appointments need to identify the applicable responsibilities.

Explain how the property will remain usable

State whether the premises are vacant or occupied. Record working hours, access routes, deliveries, storage, temporary services and areas that must remain available. Phased work needs clear boundaries and hand-back requirements for each stage.

Noise, dust, shutdowns and movement of materials affect occupants as well as contractors. These conditions belong in the scope because they influence method, price and programme.

Define finishes and completion

Specify the required finish and performance rather than relying on a broad label such as standard decoration. Identify samples or selections needing approval, and set a decision date that supports procurement.

The completion package can include inspections, commissioning results, drawings, product information, operating instructions and snagging arrangements. State which records are needed and who receives them.

Common questions

Does every refurbishment need a detailed drawing package?

The information should suit the work. A small defined alteration may use a marked-up plan and schedule, while a complex layout or service change needs coordinated design information.

Should optional work be included in the main scope?

Identify options separately with their effect on cost and programme. This keeps the essential outcome clear and makes approval decisions easier to follow.

What makes competing quotations comparable?

Give each contractor the same scope, access conditions, finish requirements and completion expectations. Compare allowances and exclusions as well as the total price.

Related projects and reading

Explore Refurbishment and Fit-Out, Design and Build and Cost Planning. Read refurbishment budgeting to build the full cost picture. Browse services, projects, sectors and locations, or discuss the proposed work.

Next

Ready when you are

Tell us about the property.

Start with the repair, maintenance need or improvement you have in mind.

Start a property enquiry