Black & White Property ServicesHave a property in mind?Start an enquiry

service page

Electrical Compliance

Overdue inspection actions, changes to circuits or uncertainty about responsibility can trigger a review. Describe when the issue started and any change in use, operation or layout. A clear history helps distinguish a new fault from an existing limitation or a planned improvement.

Tell us what needs doing

If tenants or other occupiers are affected, record which areas they use and who controls them. This helps prevent an instruction for one property area overlooking a shared system.

What the work can include

Identify installation and equipment boundaries; review reports; plan appropriate inspection or testing; track defects and retain updated records. The agreed scope should state which areas or equipment are included, what is excluded and the form of the completion record.

Ask for findings that identify the affected item or location clearly. A useful record allows you to understand what was done and arrange any follow-on work without starting again.

Important decisions

An installation condition report and portable appliance checks cover different things. Neither should be assumed to cover every electrical risk at a property.

Assessment and preparation

Provide distribution information, previous reports, alteration records and access or isolation restrictions.

Confirm keys, occupant notices, parking or unloading access and the person able to authorise additional work. Photographs can help explain the enquiry where they can be taken safely.

How the work proceeds

Reconcile the assets and reports, scope specialist work and track the actions through repair and relevant verification.

Agree any stages before work starts: investigation, a repair proposal and the authorised work may be separate instructions. At completion, establish what can be used, what remains restricted and what happens next.

Cost, timing and disruption

Installation size, operational shutdowns, missing records and the condition found influence the programme. The enquiry and available records establish what can be priced directly and what needs a site assessment first.

Where work affects an entrance, occupied room or shared service, arrange the access window with the people using it. Include any temporary arrangements and reinstatement in the scope so the quotation addresses the whole job.

Applications across sectors

Laboratories and industrial premises may have process-specific substances and equipment. Managing agents need clear landlord and occupier interfaces; education and care premises require coordination around vulnerable users. Duties and controls should follow the actual setting. Browse the full sector range and describe the actual building use when enquiring.

Locations covered

We cover Northumberland, Tyne and Wear, County Durham and Tees Valley, including Newcastle upon Tyne, Gateshead, Sunderland, Durham, Darlington, Middlesbrough and the wider towns and communities in our location directory. Send the property address and the area of the building needing attention so access and the work requirement can be considered together.

Frequently asked questions

Does a recent electrical report remove the need for maintenance?

No. New defects, damage and changes can arise after an inspection and need to be managed.

What information should I send about electrical compliance?

Provide distribution information, previous reports, alteration records and access or isolation restrictions. Include the location and the decision you need to make, such as investigating a fault, planning a repair or setting up a programme.

What affects the price and programme?

Installation size, operational shutdowns, missing records and the condition found influence the programme. Any further investigation or additional work should have a clear scope before it is authorised.

What should the completion information explain?

It should identify the equipment or areas covered, the work and checks performed, limitations and unresolved actions. Keep the record with the property information and share relevant operating instructions with the people who use the equipment or space.

Useful guidance and records

Read what is remedial action tracking for the supporting decisions and records. Remedial-action tracking explains how to carry an identified defect through to evidenced closure. The relevant official guidance provides the wider technical or management context.

Related work and your next step

Explore Asbestos Management alongside the Compliance and Specialist Risk overview. Connect ongoing work with maintenance, larger changes with projects, and browse all services.

Send Black & White Property Services the property address, symptoms or proposed change, and any existing report. We can then establish the appropriate assessment and work scope. Make an enquiry.

Next

Ready when you are

Tell us about the property.

Start with the repair, maintenance need or improvement you have in mind.

Start a property enquiry